Stop playing Tetris with your team.
Start playing Moneyball.

Most tools assign by availability. Motionode assigns by speed. Run our physics engine alongside your current tool to identify the highest-margin talent, then apply the plan.

HOW IT WORKS

The 6-Point Scoring Matrix

Motionode scores your team on these factors to recommend the optimal assignee:

Speed:

How fast do they historically close this type of task?

Quality:

How often does their work get returned by QA?

Tech Stack:

Do they know the specific technology (e.g., Node.js vs Python)?

Focus:

Are they context-switching between 5 projects or focused on one?

Cooperation:

Do they unblock others or work in silos?

Availability:

Are they actually free?

Why Velocity > Availability

Assigning by availability creates "Calendar Tetris" — forcing work into empty slots regardless of skill. Seniors burn out on trivial tasks. Juniors get blocked. Projects miss deadlines despite 100% utilization.

THE RECOMMENDATION ENGINE

From Task to Assignment in Seconds

How Motionode turns historical performance into optimal assignments.

The Input

Define the Task

We import the task list from your current tool (Asana/Jira).

The Calculation

The System Ranks Candidates

Motionode scans your entire roster. It sees that Mike is free but has a low speed score on Python. It sees that Sarah is busy until tomorrow but has a 99% speed score on Python.

The Recommendation

Optimal Path Selected

The system recommends Sarah. Even though she starts a day later, her velocity means she will finish before Mike would have.

Auto-Pilot Mode:

The system assigns Sarah instantly.

Manual Mode:

The PM sees a sorted list of candidates and chooses the best option.

Motionode vs. Traditional Assignment (On the Same Project)

Feature Calendar-Based Assignment
(Standard Availability)
Motionode
Assignment Logic "Tetris" (Availability)

Finds the first empty slot in a calendar.
"Moneyball" (Velocity)

Finds the highest probability of on-time delivery.
Skill Tracking Static Tags

You manually tag "John = Developer."
Dynamic Scoring

The system learns "John = Fast at CSS, Slow at JS."
Utilization Goal Billable Hours

Keep everyone busy 100% of the time.
Throughput

Get the project done in the shortest time.
Outcome People are busy, but projects are late. People are effective, and margins are protected.

Stop guessing who to assign.
Let the math decide.

Increase your project velocity by 30% with Motionode.

Secure Your Pilot Project See Dynamic Scheduling